NDT notes

Inspection results per weld.

Who it's for: QC, foreman, office, owner

Steps

  1. Record method (VT, PT, MT, UT, RT), inspector and Accept/Reject.
  2. Attach the report.
  3. A reject links to the repair weld that must be re-inspected.

Related