WPS / PQR library
Procedure number, code, process, base metal and filler ranges, positions, preheat, PWHT, gas and supporting PQR PDFs. Jobs and weld map entries reference a WPS.
Code work needs paperwork that stays with the job: the procedure used, a welder with an unlapsed cert, traceable material and inspection results.
Procedure number, code, process, base metal and filler ranges, positions, preheat, PWHT, gas and supporting PQR PDFs. Jobs and weld map entries reference a WPS.
Each welder's qualifications with continuity tracked (default 6 months, per-code override). Status Current, Expiring or Lapsed. Dispatch and job sign-off warn on lapsed.
Receive steel and pipe with heat number and Mill Test Report PDF. Consume onto jobs and weld IDs.
Per weld: method (VT, PT, MT, UT, RT), inspector, Accept/Reject, report attachment and repair link.

Per job: weld ID → WPS → welder → heat number → MTR. One place for the paperwork a CWI or customer asks for.
Suggestions only list welders holding a current qualification for the job's WPS. The dispatcher always confirms.
Inspection results stay on the weld. A reject links to the repair weld that gets re-inspected.