Certs & traceability

Code work needs paperwork that stays with the job: the procedure used, a welder with an unlapsed cert, traceable material and inspection results.

WPS / PQR library

Procedure number, code, process, base metal and filler ranges, positions, preheat, PWHT, gas and supporting PQR PDFs. Jobs and weld map entries reference a WPS.

Welder quals + continuity

Each welder's qualifications with continuity tracked (default 6 months, per-code override). Status Current, Expiring or Lapsed. Dispatch and job sign-off warn on lapsed.

Heat numbers + MTRs

Receive steel and pipe with heat number and Mill Test Report PDF. Consume onto jobs and weld IDs.

NDT notes

Per weld: method (VT, PT, MT, UT, RT), inspector, Accept/Reject, report attachment and repair link.

A welder in a helmet works on metal with bright sparks.

Traceability report

Per job: weld ID → WPS → welder → heat number → MTR. One place for the paperwork a CWI or customer asks for.

Dispatch that respects quals

Suggestions only list welders holding a current qualification for the job's WPS. The dispatcher always confirms.

Inspection results stay on the weld. A reject links to the repair weld that gets re-inspected.

Start free trial